Political families and officials in Taguig
3 documented family networks and 29 public officials in Taguig, Metro Manila. Every relationship on this page is linked to a published source.
City · 29 of 29 profiles are currently in office
Documented families
- Cayetano familyTaguig mayor · Senate · former local offices4 of 6 documented relatives currently in office: Lani Cayetano, Alan Peter Cayetano, Pia Cayetano, Lino CayetanoOpen the Cayetano network in the map →
- Alit familyVice mayor · former barangay leadership1 of 4 documented relatives currently in office: Arvin Ian AlitOpen the Alit network in the map →
- Tiñga familyFormer city leadership · national cultural office1 of 5 documented relatives currently in office: Kaye Chua-TiñgaOpen the Tiñga network in the map →
Public officials on record
Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.
- Alex S. Penolio — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Allan Paul C. Cruz — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Alvinleen P. Dizon — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Arnold J. Cruz — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Arvin Ian Alit — Vice MayorIn officeCitywide · 2025–2028 · source
- Carlito M. Ogalinola — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Danilo G. Castro — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Darwin B. Icay — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Edgar Victor S. Baptista — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Eduardo B. Prado — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Evelyn Delfina E. Villamor — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Fanella Joy Panga-Cruz — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Ferdinand B. Santos — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Gamaliel N. San Pedro — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Grazielle Iony De Lara-Bes — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Hannah Genele P. Pau-Tin — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Jaime R. Labampa — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Joanna Mae Pagkalinawan — SK Federation President · Ex officioIn officeCity Council · Term dates under review · source
- Jomil Bryan C. Serna — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Jorge Daniel Bocobo — District RepresentativeIn officeTaguig, District 2 · 2025–2028 · source
- Kim M. Abbang — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Lamberto M. Mañosca — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Lani Cayetano — City MayorIn officeCitywide · 2025–2028 · source
- Marisse Balina-Eron — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Marjorie Bermas-Villasis — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Nicky C. Supan — City CouncilorIn officeCouncil District 2 · 2025–2028 · source
- Raul T. Aquino — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
- Ricardo “Ading” Cruz Jr. — District RepresentativeIn officeTaguig–Pateros, District 1 · 2025–2028 · source
- Rodil C. Marcelino — City CouncilorIn officeCouncil District 1 · 2025–2028 · source
DPWH flood control projects in Taguig
The government’s Sumbong sa Pangulo portal lists 75 flood control projects in Taguig, with a combined contract cost of ₱6.03B, completed between 2022 and 2025.
The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.
| Year | Projects | Contract cost |
|---|---|---|
| 2022 | 27 | ₱2.05B |
| 2023 | 16 | ₱1.23B |
| 2024 | 27 | ₱2.21B |
| 2025 | 5 | ₱537.7M |
| Name | Projects | Contract cost |
|---|---|---|
| DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) | 10 | ₱873.0M |
| J. SIMEON CONSTRUCTION | 6 | ₱701.4M |
| TOUGHBUILT CONSTRUCTION & TRADING, INC. | 5 | ₱472.8M |
| TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC. | 3 | ₱330.9M |
| HONY TRADING & CONSTRUCTION | 5 | ₱293.3M |
| Name | Projects | Contract cost |
|---|---|---|
| Taguig City | 54 | ₱4.44B |
| Taguig City | 21 | ₱1.59B |
Largest projects
- Construction of Slope Protection Structure along C-6 Open Channel, (Phase 3), Taguig City₱141.9M · J. SIMEON CONSTRUCTION · completed 2024 · 24OB0189
- Construction of Slope Protection Structure along C-6 Open Channel, (Phase 1), Taguig City₱141.8M · J. SIMEON CONSTRUCTION · completed 2024 · 24OB0187
- Construction of Slope Protection at Lakeshore, Barangay Hagonoy, Taguig City₱141.8M · TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC. · completed 2025 · 24OB0186
- Construction of Slope Protection Structure along C-6 Open Channel, (Phase 2), Taguig City₱141.8M · J. SIMEON CONSTRUCTION · completed 2024 · 24OB0188
- Construction of Slope Protection along Pinagsama River, Taguig City (Phase 2)₱125.8M · DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) · completed 2025 · 24OB0214
- Construction of Pumping Station and Flood Control Structure at Bagumbayan River Including Upgrading of Drainage Outfall / Laterals, Brgy. Bagumbayan, Taguig City₱96.5M · ST. TIMOTHY CONSTRUCTION CORPORATION / TWENTYSIX CONSTRUCTION INC. · completed 2023 · 22OB0097
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 3, Taguig City₱96.5M · DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) · completed 2022 · 22OB0104
- Construction / Rehabilitation of Drainage System Along M. Almeda St. And Vicinity, Pateros Metro Manila₱96.5M · A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL · completed 2023 · 22OB0093
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 6, Taguig City₱96.5M · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. · completed 2022 · 22OB0109
- Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 5, Taguig City₱96.5M · ST. TIMOTHY CONSTRUCTION CORPORATION · completed 2023 · 22OB0106
Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.
Coverage
Researched subset; council and barangay coverage is incomplete.
Open the Taguig map →