Political families and officials in Romblon
3 documented family networks and 5 public officials in Romblon, MIMAROPA. Every relationship on this page is linked to a published source.
Province · 5 of 5 profiles are currently in office
Documented families
- Firmalo familyGovernor Trina Firmalo-Fabic, her father Eduardo, his cousin Baltazar and Baltazar’s father Alfonso, both former Odiongan mayors.1 of 4 documented relatives currently in office: Trina Firmalo-FabicOpen the Firmalo network in the map →
- Madrona familyThree generations connect Romblon’s congressional seat and San Agustin municipal government.3 of 6 documented relatives currently in office: Eleandro Jesus “Budoy” Madrona, Esteban Santiago “Denon” Madrona Jr., Aaron James MadronaOpen the Madrona network in the map →
- Riano familyFormer governor Jose Riano and his son Aaronn Joseph, elected to the provincial board.1 of 2 documented relatives currently in office: Aaronn Joseph RianoOpen the Riano network in the map →
Public officials on record
Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.
- Aaron James Madrona — San Agustin mayor · RomblonIn officeRomblon family connection · Current office · source
- Aaronn Joseph Riano — Romblon D1 provincial board member (2025–2028)In officeRomblon family connection · Current office · source
- Eleandro Jesus “Budoy” Madrona — Romblon lone-district representative; former governorIn officeRomblon family connection · Current office · source
- Esteban Santiago “Denon” Madrona Jr. — Congressional chief of staff (appointed) · Romblon; former San Agustin mayorIn officeRomblon family connection · Current office · source
- Trina Firmalo-Fabic — Romblon governor · former Odiongan mayorIn officeRomblon family connection · Current office · source
DPWH flood control projects in Romblon
The government’s Sumbong sa Pangulo portal lists 76 flood control projects in Romblon, with a combined contract cost of ₱5.33B, completed between 2022 and 2025.
The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.
| Year | Projects | Contract cost |
|---|---|---|
| 2022 | 27 | ₱1.24B |
| 2023 | 30 | ₱2.06B |
| 2024 | 18 | ₱1.93B |
| 2025 | 1 | ₱96.5M |
| Name | Projects | Contract cost |
|---|---|---|
| SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | 18 | ₱1.66B |
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | 12 | ₱1.27B |
| ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR | 8 | ₱439.6M |
| SCATR CONSTRUCTION | 4 | ₱398.9M |
| YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. | 1 | ₱289.5M |
| Name | Projects | Contract cost |
|---|---|---|
| Odiongan | 28 | ₱2.16B |
| San Andres | 7 | ₱564.9M |
| Alcantara | 4 | ₱555.8M |
| San Agustin | 8 | ₱436.8M |
| Looc | 4 | ₱318.7M |
| Name | Projects | Contract cost |
|---|---|---|
| Romblon | 75 | ₱5.31B |
| Occidental Mindoro | 1 | ₱19.6M |
Largest projects
- Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon₱289.5M · LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) · completed 2023 · 23E00198
- Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, Romblon₱289.5M · YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. · completed 2024 · 24E00118
- Construction of Mayha - Rizal Flood Control Structure, Tablas Island Romblon₱193.0M · LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) · completed 2023 · 23E00197
- Construction of Flood Control Structure along Mayha River (Phase 2), Odiongan, Romblon₱139.9M · SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) · completed 2024 · 24EH0074
- Construction of Gabawan River Control along Bulwang-Upstream(B/S) Phase 3, Odiongan, Romblon₱139.9M · SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) · completed 2024 · 24EH0065
- Construction of Gabawan River Control along Bulwang Upstream (B/S) Phase 2, Odiongan Romblon₱139.9M · SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) · completed 2024 · 24EH0064
- Construction of Mainit (DS - RS ) Flood Control Structure, Odiongan, Romblon₱139.9M · SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) · completed 2024 · 24EH0081
- Construction of Mainit (DS - LS), Flood Control Structure, Odiongan, Romblon₱135.1M · SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) · completed 2024 · 24EH0080
- Construction of Flood Control Structure along David Bridge Upstream (L/S), Odiongan, Romblon₱125.5M · SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) · completed 2024 · 24EH0084
- Construction of Pili Flood Control Structure (Phase 2), Looc, Romblon₱115.8M · LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) · completed 2022 · 22E00057
Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.
Coverage
Documented family networks; not a complete government or barangay roster. National offices are distinct from local offices.
Open the Romblon map →