Political families and officials in Pateros
1 documented family network and 1 public official in Pateros, Metro Manila. Every relationship on this page is linked to a published source.
Municipality · 1 of 1 profiles are currently in office
Documented families
- Cayetano familyHistorical Taguig–Pateros representation · wider family4 of 6 documented relatives currently in office: Lani Cayetano, Alan Peter Cayetano, Pia Cayetano, Lino CayetanoOpen the Cayetano network in the map →
Public officials on record
Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.
- Gerald German — Pateros mayorIn officePateros · Office record reviewed 11 September 2026 · source
DPWH flood control projects in Pateros
The government’s Sumbong sa Pangulo portal lists 13 flood control projects in Pateros, with a combined contract cost of ₱744M, completed between 2024 and 2025.
The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.
| Year | Projects | Contract cost |
|---|---|---|
| 2024 | 12 | ₱736.9M |
| 2025 | 1 | ₱6.7M |
| Name | Projects | Contract cost |
|---|---|---|
| ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. | 3 | ₱189.9M |
| ZYRE TRADING AND CONSTRUCTION | 3 | ₱144.5M |
| EBUILDERS CONSTRUCTION & DEVELOPMENT CORP. | 1 | ₱70.9M |
| AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. | 1 | ₱70.9M |
| DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) | 1 | ₱70.9M |
| Name | Projects | Contract cost |
|---|---|---|
| Taguig City | 13 | ₱743.6M |
Largest projects
- Construction of Slope Protection along Panday River, (Phase 9), Pateros₱70.9M · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. · completed 2024 · 24OB0179
- Construction of Slope Protection along Panday River, (Phase 8), Pateros, Metro Manila₱70.9M · EBUILDERS CONSTRUCTION & DEVELOPMENT CORP. · completed 2024 · 24OB0178
- Construction of Slope Protection along Panday River, (Phase 5), Pateros₱70.9M · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. · completed 2024 · 24OB0175
- Construction of Slope Protection Along Pateros River, (Phase 2), Taguig City₱70.9M · DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) · completed 2024 · 24OB0181
- Construction of Slope Protection along Panday River, (Phase 7), Pateros, Metro Manila₱70.9M · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. · completed 2024 · 24OB0177
- Construction of Slope Protection along Panday River, (Phase 10), Pateros₱70.9M · HONY TRADING & CONSTRUCTION · completed 2024 · 24OB0174
- Construction of Slope Protection Along Pateros River, (Phase 1), Taguig City₱70.9M · B. BERNARDO CONST., INC. · completed 2024 · 24OB0180
- Construction/Rehabilitation of Retaining Wall along Sta. Ana River, Pateros, Metro Manila (Package VII)₱48.5M · ZYRE TRADING AND CONSTRUCTION · completed 2024 · 24OB0158
- Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package VI)₱48.0M · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. · completed 2024 · 24OB0169
- Construction of Retaining Wall and Rehabilitation of Sta. Ana River, Pateros, Metro Manila (Package III)₱48.0M · ZYRE TRADING AND CONSTRUCTION · completed 2024 · 24OB0166
Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.