Political families and officials in Malabon
2 documented family networks and 2 public officials in Malabon, Metro Manila. Every relationship on this page is linked to a published source.
City · 2 of 2 profiles are currently in office
Documented families
- Sandoval familyMarriage · local and former congressional office1 of 2 documented relatives currently in office: Jeannie SandovalOpen the Sandoval network in the map →
- Oreta familyDocumented relatives · local and national office histories1 of 3 documented relatives currently in office: Antolin “Lenlen” Oreta IIIOpen the Oreta network in the map →
Public officials on record
Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.
- Antolin “Lenlen” Oreta III — Malabon representative · former mayorIn officeMalabon family connection · Office record reviewed 11 September 2026 · source
- Jeannie Sandoval — Malabon mayorIn officeMalabon family connection · Office record reviewed 11 September 2026 · source
DPWH flood control projects in Malabon
The government’s Sumbong sa Pangulo portal lists 63 flood control projects in Malabon, with a combined contract cost of ₱3.42B, completed between 2022 and 2024.
The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.
| Year | Projects | Contract cost |
|---|---|---|
| 2022 | 23 | ₱960.7M |
| 2023 | 16 | ₱769.9M |
| 2024 | 24 | ₱1.69B |
| Name | Projects | Contract cost |
|---|---|---|
| A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) | 6 | ₱390.1M |
| A.L. SALAZAR CONSTRUCTION, INC. | 5 | ₱304.5M |
| E. F. CHUA CONSTRUCTION, INC. | 2 | ₱278.9M |
| JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS | 5 | ₱245.5M |
| ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) | 6 | ₱232.9M |
| Name | Projects | Contract cost |
|---|---|---|
| Malabon City | 63 | ₱3.42B |
Largest projects
- Rehabilitation of Riverwall along Tullahan River at Brgy. San Agustin to Brgy. Concepcion, Malabon City₱144.8M · L.R. TIQUI BUILDERS, INC. · completed 2024 · 23OA0084
- Construction of South Pinagkabalian Pumping Station (Phase 2), Malabon City₱144.7M · E. F. CHUA CONSTRUCTION, INC. · completed 2024 · 24O00023
- Construction of Dampalit Pumping Station (Phase 2), Malabon City₱134.2M · E. F. CHUA CONSTRUCTION, INC. · completed 2024 · 23OA0082
- Construction of Pumping Station in Batasan River (Phase 1), Malabon City₱96.5M · NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J · completed 2024 · 23OA0070
- River Improvement Works along Dampalit River, Brgy. Dampalit, Malabon₱96.5M · A.L. SALAZAR CONSTRUCTION, INC. / AL-REM KONSTRUCT INC. · completed 2024 · 23OA0083
- Construction of Flood Control Structure, Barangay Tañong to Barangay Dampalit, Malabon City₱93.6M · A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) · completed 2024 · 24OA0050
- Closing of Remaining Gaps along Malabon-Tullahan River (Potrero Section), Malabon City₱90.7M · A.L. SALAZAR CONSTRUCTION, INC. · completed 2023 · 22OA0064
- Closing of Remaining Gaps along Malabon-Tullahan River (Catmon, Tenajeros and PNR Station), Malabon City₱90.7M · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. / CALCON ENGINEERING · completed 2023 · 22OA0063
- Closing of Gaps along Malabon-Navotas & Tullahan River, Malabon City₱90.7M · NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J · completed 2023 · 22OA0062
- Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 1), Malabon City₱69.3M · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. · completed 2024 · 24OA0042
Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.
Coverage
Researched subset; council and barangay coverage is incomplete.
Open the Malabon map →