Political families and officials in Lucena
5 documented family networks and 15 public officials in Lucena, CALABARZON. Every relationship on this page is linked to a published source.
Independent city · 15 of 15 profiles are currently in office
Documented families
- Alcala familyLucena mayor, vice mayor and councilor; relatives in Quezon provincial office.7 of 12 documented relatives currently in office: Mark Alcala, Roderick “Dondon” Alcala, Ryan Caezar “Ayan” Alcala, Anacleto “Third” Alcala IIIOpen the Alcala network in the map →
- Abcede familyFormer OIC mayor → daughter serving on the city council.1 of 2 documented relatives currently in office: Sunshine Abcede-LlagaOpen the Abcede network in the map →
- Noche familyFormer councilor → son on today’s city council.1 of 2 documented relatives currently in office: Wilbert McKinly NocheOpen the Noche network in the map →
- Brizuela familyFormer councilor → son on today’s city council.1 of 2 documented relatives currently in office: Benito “Baste” Brizuela Jr.Open the Brizuela network in the map →
- Suarez familyLucena’s district representative, his parents and spouse.1 of 4 documented relatives currently in office: David “Jay-Jay” SuarezOpen the Suarez network in the map →
Public officials on record
Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.
- Americo “Amer” Lacerna — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Anacleto “Jun” Alcala Jr. — Lucena city administratorIn officeLucena City · Appointed office · reported January 2026 · source
- Benito “Baste” Brizuela Jr. — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Danilo “Danny” Faller — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- David “Jay-Jay” Suarez — Quezon D2 representative (includes Lucena); former governorIn officeLucena City · Quezon second congressional district · 2025–2028 · source
- Edwin “Dok Love” Pureza — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Elizabeth “Beth” Sio — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Jose Christian Ona — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Mark Alcala — Lucena mayorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Patrick Norman Nadera — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Reil Briones — Ex officio councilor; Liga president and Talao-Talao barangay chairIn officeLucena City · Identified in office by PIA, 27 July 2026 · source
- Roderick “Dondon” Alcala — Lucena vice mayorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Ryan Caezar “Ayan” Alcala — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Sunshine Abcede-Llaga — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
- Wilbert McKinly Noche — CouncilorIn officeLucena City · 2025–2028 · post-assumption roster checked 13 September 2026 · source
DPWH flood control projects in Lucena
The government’s Sumbong sa Pangulo portal lists 16 flood control projects in Lucena, with a combined contract cost of ₱805M, completed between 2022 and 2025.
The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.
| Year | Projects | Contract cost |
|---|---|---|
| 2022 | 4 | ₱68.7M |
| 2023 | 6 | ₱287.6M |
| 2024 | 5 | ₱352.3M |
| 2025 | 1 | ₱96.5M |
| Name | Projects | Contract cost |
|---|---|---|
| RAPID FOREMOST CONST. CO. | 4 | ₱252.4M |
| RAPID FOREMOST CONST. CO. / JAICA CONST. CORP | 2 | ₱145.5M |
| UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES | 1 | ₱96.5M |
| RAPID FOREMOST CONST. CO. / JELCON-CONSTRUCTION AND TRADING CORPORATION | 1 | ₱96.5M |
| WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. | 1 | ₱96.5M |
| Name | Projects | Contract cost |
|---|---|---|
| Quezon | 16 | ₱805.1M |
Largest projects
- Construction of Dumacaa River Flood Control Structure (Package 22), Lucena City, Quezon₱96.5M · UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES · completed 2025 · 24DJ0115
- Construction of Dumacaa River Flood Control (Package 8), Lucena City, Quezon₱96.5M · RAPID FOREMOST CONST. CO. / JELCON-CONSTRUCTION AND TRADING CORPORATION · completed 2024 · 23DJ0073
- Construction of Iyam River Flood Control, Brgy. Cotta (Phase 3), Lucena City, Quezon₱96.5M · RAPID FOREMOST CONST. CO. / JAICA CONST. CORP · completed 2023 · 22DJ0071
- Construction of Seawall, Barangay Barra, Lucena City, Quezon₱96.5M · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. · completed 2024 · 23DJ0094
- Construction of Dumacaa River Flood Control (Package 9), Lucena City, Quezon₱96.5M · RAPID FOREMOST CONST. CO. · completed 2024 · 23DJ0072
- Construction of Iyam River Flood Control (Package 1), Lucena City, Quezon₱57.9M · RAPID FOREMOST CONST. CO. · completed 2024 · 23DJ0016
- Construction of Dumacaa River Flood Control, Brgy. Cotta, Lucena City, Quezon (Package 2)₱49.0M · RAPID FOREMOST CONST. CO. · completed 2023 · 22DJ0149
- Construction of Dumacaa River Flood Control, Brgy. Cotta, Lucena City, Quezon₱49.0M · RAPID FOREMOST CONST. CO. / JAICA CONST. CORP · completed 2022 · 22DJ0064
- Construction of Dumacaa River Flood Control, Brgy. Cotta, Lucena City, Quezon (Package 3)₱49.0M · RAPID FOREMOST CONST. CO. · completed 2023 · 22DJ0147
- Construction of Slope Protection along Dumacaa River, Barangay IX, Lucena City, Quezon₱49.0M · I.A . BOSQUE CONSTRUCTION CORPORATION · completed 2023 · 22DJ0073
Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.
Coverage
Documented family networks; not a complete government or barangay roster. National offices are distinct from local offices.
Open the Lucena map →