Political families and officials in Camiguin
2 documented family networks and 21 public officials in Camiguin, Northern Mindanao. Every relationship on this page is linked to a published source.
Province · 21 of 21 profiles are currently in office
Documented families
- Romualdo familyThree generations have held Camiguin's governorship, lone congressional seat, vice governorship and the Mambajao mayoralty without interruption since 1987, with the family occupying all four top posts after the 2019, 2022 and 2025 elections.4 of 8 documented relatives currently in office: Jurdin Jesus “JJ” Modina Romualdo, Rodin “Dan-Dan” Modina Romualdo, Xavier Jesus “XJ” Dela Fuente Romualdo, Yñigo Jesus “Yggy” De La Fuente RomualdoOpen the Romualdo network in the map →
- Uayan (Sagay) familyBrothers Richard and Joseph Uayan held the Sagay mayoralty in succession: Richard was elected mayor in 2022 and died in office in March 2023, and Vice Mayor Joseph succeeded him and was elected mayor in 2025.1 of 2 documented relatives currently in office: Joseph Go “Andal” UayanOpen the Uayan (Sagay) network in the map →
Public officials on record
Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.
- Carlo Chan Borromeo — Board member, 1st districtIn officeCamiguin · 2025–2028 · source
- Christina Tadlas Loquias — Board member, 2nd districtIn officeCamiguin · 2025–2028 · source
- Helenio Napone Abecia — Vice mayorIn officeGuinsiliban · Camiguin · 2025–2028 · source
- Joanne Marie Rubin — MayorIn officeGuinsiliban · Camiguin · 2025–2028 · source
- Joseph Go “Andal” Uayan — MayorIn officeSagay · Camiguin · 2025–2028 · source
- Jurdin Jesus “JJ” Modina Romualdo — Representative, lone districtIn officeCamiguin · 2025–2028 · source
- Kiterio Antonio Uy Palarca II — MayorIn officeCatarman · Camiguin · 2025–2028 · source
- Louis Bollozos — Board member, 1st districtIn officeCamiguin · 2025–2028 · source
- Lourdes Mendoza Gamutan — Board member, 1st districtIn officeCamiguin · 2025–2028 · source
- Marivic Jansol — Board member, 1st districtIn officeCamiguin · 2025–2028 · source
- Nerio Yamit Galochino — Vice mayorIn officeMahinog · Camiguin · 2025–2028 · source
- Niel John Bacuñata Yangco — Vice mayorIn officeSagay · Camiguin · 2025–2028 · source
- Rey Lawrence Khu Tan — MayorIn officeMahinog · Camiguin · 2025–2028 · source
- Robert Jones Hondanero Closas — Vice mayorIn officeMambajao · Camiguin · 2025–2028 · source
- Rodin “Dan-Dan” Modina Romualdo — Vice governorIn officeCamiguin · 2025–2028 · source
- Rony Nanol Sagocsoc — Vice mayorIn officeCatarman · Camiguin · 2025–2028 · source
- Shella Galope Babanto — Board member, 1st districtIn officeCamiguin · 2025–2028 · source
- Stanley Kalaw Planco — Board member, 2nd districtIn officeCamiguin · 2025–2028 · source
- Webb Itum Bajenio — Board member, 2nd districtIn officeCamiguin · 2025–2028 · source
- Xavier Jesus “XJ” Dela Fuente Romualdo — GovernorIn officeCamiguin · 2025–2028 · source
- Yñigo Jesus “Yggy” De La Fuente Romualdo — MayorIn officeMambajao · Camiguin · 2025–2028 · source
DPWH flood control projects in Camiguin
The government’s Sumbong sa Pangulo portal lists 32 flood control projects in Camiguin, with a combined contract cost of ₱1.32B, completed between 2022 and 2025.
The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.
| Year | Projects | Contract cost |
|---|---|---|
| 2022 | 8 | ₱215.3M |
| 2023 | 12 | ₱452.1M |
| 2024 | 10 | ₱530.1M |
| 2025 | 2 | ₱123.4M |
| Name | Projects | Contract cost |
|---|---|---|
| SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION) | 9 | ₱292.6M |
| VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION) | 3 | ₱274.3M |
| JEJOR'S CONSTRUCTION CORPORATION | 4 | ₱200.2M |
| JAPUZ-JANSOL ENTERPRISES | 4 | ₱182.2M |
| ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) | 1 | ₱96.5M |
| Name | Projects | Contract cost |
|---|---|---|
| Catarman | 13 | ₱663.7M |
| Mambajao | 11 | ₱376.0M |
| Sagay | 4 | ₱194.2M |
| Mahinog | 4 | ₱86.8M |
| Name | Projects | Contract cost |
|---|---|---|
| Camiguin | 32 | ₱1.32B |
Largest projects
- Construction of Dinangasan River Control, Package 1, Catarman, Camiguin₱115.7M · VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION) · completed 2024 · 23KE0036
- Construction of Slope Protection along Cross-Country Road, Catarman to Mambajao (Package 1), Catarman, Camiguin₱96.5M · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) · completed 2024 · 22KE0080
- Construction of River Control along Bugang Bridge, Sagay, Camiguin₱94.6M · JAPUZ-JANSOL ENTERPRISES · completed 2025 · 24KE0090
- Construction of River Control/ Drainage System at Tangaro Box Culvert, K38+000.00 - K39+220.00, Catarman, Camiguin₱92.2M · VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION) · completed 2022 · 22KE0006
- Construction of Slope Protection along Camiguin Circumferential Road, Lawigan,Catarman, Camiguin₱72.2M · SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. · completed 2024 · 22KE0051
- Construction of Dinangasan River Control, Package 2, Catarman, Camiguin₱66.4M · VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION) · completed 2023 · 22KE0011
- Construction of River Control along Timayog Bridge I Abutments, Catarman, Camiguin₱56.2M · JEJOR'S CONSTRUCTION CORPORATION · completed 2024 · 24KE0013
- Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin₱49.0M · JAPUZ-JANSOL ENTERPRISES · completed 2023 · 22KE0003
- Construction of River Control, along Timayog Bridge II, K45 + 000 - K45 + 190, K45+209.50 - K45+388, Catarman, Camiguin₱49.0M · JEJOR'S CONSTRUCTION CORPORATION · completed 2023 · 22KE0004
- Construction of River Control/ Drainage System at Lumad Box Culvert, K63.8+260.00 - K63.8+451.50, K63.8+464.00 - K63.8+538, K63.80+800.00 - K63.8+934.00, Mambajao, Camiguin₱49.0M · WDM CONSTRUCTION AND SUPPLIES · completed 2023 · 22KE0007
Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.
Coverage
Documented family networks; not a complete government or barangay roster. National offices are distinct from local offices.
Open the Camiguin map →