Political families and officials in Abra

7 documented family networks and 58 public officials in Abra, Cordillera. Every relationship on this page is linked to a published source.

Province · 58 of 58 profiles are currently in office

Open Abra on the interactive map →See the families as connected networks and tap any name for the evidence.

Documented families

Public officials on record

Offices are recorded from the linked directories and election results. This is a researched roster, not a complete government directory.

DPWH flood control projects in Abra

The government’s Sumbong sa Pangulo portal lists 105 flood control projects in Abra, with a combined contract cost of ₱7.65B, completed between 2022 and 2025.

The project list the government published in August 2025, when the flood control scandal broke. Approved contract records: project counts and contract costs only. A project’s location is not a finding of wrongdoing, and this list does not mark any project as ghost or substandard. A province’s figures include the cities inside it.

By completion year
YearProjectsContract cost
202253₱3.13B
202336₱2.68B
202415₱1.79B
20251₱49.0M
Contractors with the largest totals
NameProjectsContract cost
MG SAMIDAN CONSTRUCTION31₱2.95B
ST. TIMOTHY CONSTRUCTION CORPORATION30₱1.80B
739 BUILDERS21₱1.33B
PHESCO, INCORPORATED4₱338.5M
MG SAMIDAN CONSTRUCTION / RM30 PSG CONSTRUCTION CORPORATION4₱298.7M
Cities and towns with the largest totals
NameProjectsContract cost
La Paz28₱2.12B
Tayum7₱773.2M
Dolores8₱674.5M
Bucay14₱668.0M
Lagangilang5₱482.5M
Legislative districts
NameProjectsContract cost
Abra105₱7.65B

Largest projects

Source: DPWH flood control projects · Sumbong sa Pangulo, read through a public mirror of the same records. Data built 2026-09-23.

Coverage

Documented family networks; not a complete government or barangay roster. National offices are distinct from local offices.

Open the Abra map →

All places →